logo
Good price  online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Heavy Duty Metal Shelving
Created with Pixso. Warehouse Heavy Duty Metal Shelving 2500mm Powder Coated Steel Rack

Warehouse Heavy Duty Metal Shelving 2500mm Powder Coated Steel Rack

Brand Name: JINTA
Model Number: JT-C33
MOQ: 50
Price: USD 100- 180 per piece
Delivery Time: 15-25 days
Payment Terms: L/C, T/T, Western Union
Detail Information
Place of Origin:
China
Certification:
ISO 9001
Product Name:
Warehouse Rack
Product No.:
JT-C33
No. Of Layer:
1-9 Layers
Surface Finished:
Power Coated
Material:
Cold Rolled Steel
Capacity:
135kgs
OEM & ODM:
Accepted
Use:
Warehouse
Advantage:
Factory Price
Color:
Customized
Place Of Origin:
Changshu,China
Packaging Details:
bubble / carton /pallet or negotiable
Supply Ability:
4500 Ton Per Month
Highlight:

Warehouse Heavy Duty Metal Shelving

,

ISO9001 Heavy Duty Metal Shelving

,

2500mm powder coated steel rack

Product Description

Metal Display Shelving Heavy Duty 135 Kgs Per Layer Storage Use Powder Coated Finished

 

Specifications

 

Product Name JT-C33
Size(mm) 1600*1000*2500
Upright(mm) 80*60*(1.5-2.3)
90*70*(1.8-2.2)
Layer shelf(mm) 0.6-1.2
Beam(mm) 100*50(1.5-2.5)
120*50(1.5-2.0)
Capacity 135kg per layer
material cold rolled steel
surface treatment powder coated
payment T/T 30% deposit, 70% balance paid against the copy of B/L
package by bubble or negotiable
deliver time 20 days agaisnt the date deposit arrived
why choose us? 1.We supply high quality products with reasonable price.
2.We are the professional manufacturer(Started in 1998,30000 square meter, ISO&BV certified.)
3.Advanced Production machine.
4.Strict quality control system.
5.We have professional sales team.
6.Experienced exporting for all over the world.
7.We supply one-step solution service.

 

FAQ

 

Q1: Can I print our logo on your products?

A1: Yes, OEM & ODM are both supported.

 

Q2: Can you provide samples? If yes, how about the delivery time?

A2: Yes. Generally speaking,we charge triple for samples, and return 100% as discount in bulk order.

Depend on different items, it will takes 7-10days.

 

Q3: What payment ways do you support?

A3: T/T, Western union and L/C 100% at sight.

 

Q4: How many QC and Engineer you have?

A4: We have 8 professional QC & Engineer.

 

Q5: How can I trust your quality?

A5: We support PICC to assure your payment safety, ISO and BV to assure the quality.

 

More Images

Warehouse Heavy Duty Metal Shelving 2500mm Powder Coated Steel Rack 0

Warehouse Heavy Duty Metal Shelving 2500mm Powder Coated Steel Rack 1